play_arrow

keyboard_arrow_right

Listeners:

Top listeners:

skip_previous skip_next
00:00 00:00
playlist_play chevron_left
volume_up
  • play_arrow

    Radio Next TV Radio Next TV

Uncategorized

City of Gary invests $1.6 million in major Ridge Road resurfacing and infrastructure project

todayJune 4, 2026

Background
share close

Drivers are encouraged to expect temporary lane closures, delays and construction activity throughout the duration of the project.

Written by: Brian Wallace

Rate it

Post comments (0)

Leave a reply

Your email address will not be published. Required fields are marked *